按行业分类的 解决方案
定制 流程
提交 询价
告诉我们您的具体需求。
数千客户 信赖我们
来自全球客户的高度评价。
“碳纤维吊牌品质卓越,编织纹路完美无瑕,表面处理精致。为品牌订购了500件——每一件都完美无缺。”
“发货迅速,沟通顺畅。碳纤维尺子的品质超出了我们的预期,下次一定会再次订购。”
“我们的汽车项目需要定制碳纤维面板。Mastermate完全按照规格交付,准时且价格有竞争力。强烈推荐。”
“产品品质优秀,服务专业。碳纤维珠宝做工精美,包装也非常安全,适合国际运输。”
“合作过的最好的碳纤维供应商。大批量订单品质稳定一致,OEM服务一流——定制Logo雕刻效果惊艳。”
“先订了样品就被打动了,现在已经是常客。3K斜纹编织的表面效果令人惊叹,工厂直供价格为我们节省了大量成本。”
Frequently asked questions
How does the OEM/ODM process work at Mastermate?+
Six steps: (1) Send a brief + reference files; (2) Receive engineering quote in 24 hours; (3) Approve quote and pay tooling deposit (if needed); (4) Receive first-article sample in 10-20 days; (5) Approve sample and place production order; (6) Production in 15-30 days, then shipment. A dedicated project engineer (not a sales rep) handles every step.
What files and information do you need to start a custom project?+
Ideally: 3D CAD (.STEP, .STP, .SLDPRT, .X_T), or 2D drawings (.PDF, .DXF) with dimensions and tolerances. We also accept hand sketches with target sizes, reference photos, or even just "I want this with carbon fiber instead of plastic" — our team can reverse-engineer from physical samples.
Do you sign NDAs and protect my designs?+
Yes. We sign mutual NDAs on request before any file exchange. All client files are stored on access-controlled servers and destroyed after project completion if requested. Mould tooling is stored under client name and never used for other customers. We can also assign IP rights in writing on customer-funded tooling.
How long does tooling and first article take?+
Soft tooling (vacuum-bag layup over PU): 15-25 days. Hard tooling (aluminum mould): 35-60 days. CNC fixtures for plate-cut parts: 5-10 days. First-article sample is included in tooling cost. Helmet shell tooling with FEA + certification: 60-90 days. Tooling costs $300-$45,000 depending on complexity.
What is the minimum order for custom-tooled products?+
For most categories, custom tooling makes sense at MOQ 50-100 pcs. Below 50 pcs we recommend modifying an existing stock product or using soft tooling (lower MOQ but slightly higher per-piece cost). Above 1,000 pcs, the per-piece tooling amortization becomes negligible.
Can you reverse-engineer a part from a physical sample?+
Yes. Ship us a sample and we 3D-scan it ($150-$400), produce CAD, send you the file for approval, then mould a first article in 20-25 days. Useful for replacing OEM parts on cars/bikes/drones where original CAD is unavailable.