Free sample · Quote within 2 hours · ISO 9001 carbon fiber factory · 100+ countries shippedinfo@carbonfactorys.comWhatsApp
Custom Solutions

One-Stop Carbon Fiber
Custom Solutions

From concept to production, we handle everything. Design optimization, rapid sampling, batch manufacturing, and quality assurance — all in one place.

Solutions by Industry

Daily Goods
Wallets, phone cases, insoles & more
Leisure
Furniture, art & lifestyle products
Jewelry
Rings, bracelets, pendants & luxury items
Sports
Bicycles, skateboards, sports equipment
Helmets
Carbon fiber hard hats, motorcycle & sports helmets
Drone & UAV
CNC frames, arms, propellers & structural parts
Automotive
Hoods, spoilers, diffusers & trim panels
Construction
Structural reinforcement & building panels
Raw Materials
Carbon fiber sheets, plates, strips & tubes

Our Process

01
Consultation
Share your requirements, drawings or ideas with our engineering team.
02
Design Review
We review your blueprints and suggest optimizations for carbon fiber.
03
Deposit
Pay a deposit to start sampling. Typically 30–50% of sample cost.
04
Sampling
Rapid prototyping within 7–15 business days for your approval.
05
Confirmation
Sample confirmed, final specs locked, production timeline set.
06
Balance Payment
Pay the remaining balance before mass production begins.
07
Production
Batch manufacturing with strict in-process quality control.
08
QC & Shipping
Full inspection, professional packaging & door-to-door logistics.
09
After-Sales
Dedicated support, warranty coverage & reorder management.

Submit Your Project

Complete the form below to get started. Our team will review and contact you within 2 business hours.

Free Design Review
24-Hour Quotation
7-15 Days Sampling
NDA Available
Customer Reviews

Trusted by Businesses Worldwide

See what our customers around the globe say about our products and services.

4.8
Google Reviews · 127 reviews
4.8
Trustpilot · 89 reviews
Google

Outstanding quality carbon fiber hang tags. The weave pattern is flawless and the finish is impeccable. Ordered 500 pieces for our brand — every single one was perfect.

M
Michael T.
2 weeks ago
Trustpilot

Fast shipping and excellent communication. The carbon fiber rulers we ordered exceeded our expectations. Will definitely order again for our next project.

S
Sarah K.
1 month ago
Google

We needed custom carbon fiber panels for our automotive project. Mastermate delivered exactly what we specified, on time and at a competitive price. Highly recommend.

D
David L.
3 weeks ago
Trustpilot

Great product quality and professional service. The carbon fiber jewelry pieces are beautifully crafted. Packaging was also very secure for international shipping.

E
Emma W.
1 month ago
Google

Best carbon fiber supplier we have worked with. Consistent quality across large batches. Their OEM service is top-notch — custom logo engraving looks amazing.

J
James R.
2 months ago
Trustpilot

Ordered sample pieces first and was impressed. Now we are a regular customer. The 3K twill weave finish is stunning. Factory direct pricing saves us a lot.

L
Lisa C.
3 weeks ago

Frequently asked questions

How does the OEM/ODM process work at Mastermate?+

Six steps: (1) Send a brief + reference files; (2) Receive engineering quote in 24 hours; (3) Approve quote and pay tooling deposit (if needed); (4) Receive first-article sample in 10-20 days; (5) Approve sample and place production order; (6) Production in 15-30 days, then shipment. A dedicated project engineer (not a sales rep) handles every step.

What files and information do you need to start a custom project?+

Ideally: 3D CAD (.STEP, .STP, .SLDPRT, .X_T), or 2D drawings (.PDF, .DXF) with dimensions and tolerances. We also accept hand sketches with target sizes, reference photos, or even just "I want this with carbon fiber instead of plastic" — our team can reverse-engineer from physical samples.

Do you sign NDAs and protect my designs?+

Yes. We sign mutual NDAs on request before any file exchange. All client files are stored on access-controlled servers and destroyed after project completion if requested. Mould tooling is stored under client name and never used for other customers. We can also assign IP rights in writing on customer-funded tooling.

How long does tooling and first article take?+

Soft tooling (vacuum-bag layup over PU): 15-25 days. Hard tooling (aluminum mould): 35-60 days. CNC fixtures for plate-cut parts: 5-10 days. First-article sample is included in tooling cost. Helmet shell tooling with FEA + certification: 60-90 days. Tooling costs $300-$45,000 depending on complexity.

What is the minimum order for custom-tooled products?+

For most categories, custom tooling makes sense at MOQ 50-100 pcs. Below 50 pcs we recommend modifying an existing stock product or using soft tooling (lower MOQ but slightly higher per-piece cost). Above 1,000 pcs, the per-piece tooling amortization becomes negligible.

Can you reverse-engineer a part from a physical sample?+

Yes. Ship us a sample and we 3D-scan it ($150-$400), produce CAD, send you the file for approval, then mould a first article in 20-25 days. Useful for replacing OEM parts on cars/bikes/drones where original CAD is unavailable.

Still have questions? Talk to our engineering team.Send an inquiry